Holy ****dick you are a massive twatwaffle.I know i'm in the minority here but I think this is a bad investment. Who cares about video boards when there's a live game happening on the field? This isn't like the CEC were they didn't even have video boards until last year, Folsom does have some, they suck but they're still there. And they hardly ever use them anyways except for showing the occasional replay. If these were cheap that would be one thing but $7 million could have been spent in better ways then this such as enlarging the amount of cash Bohn had at his disposal during the coaching search last year. The priority should be improving the product on the field, not the confines under which that product is viewed.
This is good stuff. Can't wait. The article mentions nothing of the sound system being upgraded which I hope is also being considered. Both the CEC and Folsom need better sound systems as well as video.
The control room being mentioned will be located in the new practice facility.
Screen is 2.5Times larger, for twice the cost. Adjusting for inflation we got a ****ing steal.We need video boards, but 7 million? Are you ****ing kidding me? I bet the junta is pissed.
Screen is 2.5Times larger, for twice the cost. Adjusting for inflation we got a ****ing steal.
Screen is 2.5Times larger, for twice the cost. Adjusting for inflation we got a ****ing steal.
Huh?
So would you rather have something that looked sick like this (hate to link a Uterus item but that thing is impressive):I know i'm in the minority here but I think this is a bad investment. Who cares about video boards when there's a live game happening on the field? This isn't like the CEC were they didn't even have video boards until last year, Folsom does have some, they suck but they're still there. And they hardly ever use them anyways except for showing the occasional replay. If these were cheap that would be one thing but $7 million could have been spent in better ways then this such as enlarging the amount of cash Bohn had at his disposal during the coaching search last year. The priority should be improving the product on the field, not the confines under which that product is viewed.
So would you rather have something that looked sick like this (hate to link a Uterus item but that thing is impressive):
or something with black squares and green lines running through it? Recruits will be impressed with that.
The current board uses 40% of the available space, the new board will use 100% of that space. 250% increase
Current Board cost 3.6 Million. New board cost 7 million which is roughly twice the price.
We need video boards, but 7 million? Are you ****ing kidding me? I bet the junta is pissed.
7 million is a small investment to make a very important visual upgrade to visitors and recruits. 7 Million could be a first step in improving the product on the field. Especially if a practice facility follows.I know i'm in the minority here but I think this is a bad investment. Who cares about video boards when there's a live game happening on the field? This isn't like the CEC were they didn't even have video boards until last year, Folsom does have some, they suck but they're still there. And they hardly ever use them anyways except for showing the occasional replay. If these were cheap that would be one thing but $7 million could have been spent in better ways then this such as enlarging the amount of cash Bohn had at his disposal during the coaching search last year. The priority should be improving the product on the field, not the confines under which that product is viewed.
Did you even read the article?When did we buy the old tvs and how much was a 32 inch lcd then?
Did you even read the article?
Me? No.
...boards are 13 years old, they had a 10 year maximum life. So we got our money's worth. New ones are projected to last 12 years
Dumbass.
You can't give that $ to the athletes, and up to date boards will only help with recruiting, thus improving the product on the field.
How many jrk accounts do you have?
You know things.... You know important things.... You know about the practice facility
Members of Allbuffs, whats the stance on waterboarding?
...boards are 13 years old, they had a 10 year maximum life. So we got our money's worth. New ones are projected to last 12 years