GoBuffs08
Well-Known Member
Hmm. Then I am confused given the photo of the IPF site work. You'd think if an underground garage is going there, they would be excavating and building the perimeter walls. I can't really make out in the picture what they are doing. Did they haul in a bunch of dirt and place it on the site? Sometimes they will do that to add a surcharge for compaction. Maybe that's part of the cost increase. What you do is load the site with a big pile of soil for a few months until the subgrade reaches maximum compaction. That's all I can figure.
All they have done at the IPF site is remove the turf, they may have relocated utilities but can't tell. The construction access road runs through the east end of Franklin. There is still a good amount of turf on Franklin that has been fenced off from the construction traffic. Looking at the amount of work that has happened in the NE corner where that big hill used to be walking up to the stadium, I would guess that they will begin excavating in the next week or so.